Date: 27-Nov-2009   URL: www.sun.com/remanufactured/process.jsp

Remanufactured Systems Advantage Program

Active TabOverview
 
Begin Product Tab Sub Links At a Glance Active Sub Link Process
Step 1: Inspection
Prior to integration, major components are inspected. Revision levels are screened to meet field serviceability requirements.
 
Step 2: Traceability
Serial numbers are bar code scanned and recorded at both the system and component level to provide traceability during testing, throughout all factory processing, and after customer installation.
 
Step 3: Build and Test
Sun's proprietary testing procedures are an integral part of the assembly process, and all systems must pass these demanding tests before moving on to the next step in the process.
 
Step 4: Quality Control and Serialization
Upon successful completion of system tests, each system receives a new serial number, and all corresponding internal component serial numbers for that unit are recorded and documented to ensure quality and traceability for each system.
 
Step 5: Safety, Final Inspection, and Pack Out
A Safety test (Hipot) done at this stage, and, then, all products are given a final visual inspection. All Sun remanufactured products are packed in new packaging material that is prequalified to OEM standards for safe shipment.
 

Only products that meet the above requirements are allowed to display the Remanufactured label. We stand behind our products by offering complete warranty coverage and full Solaris Operating System Right-to-Use software license.

 
 
Copyright 2004-2009 Sun Microsystems, Inc.