|
Site Audit (On-site)
|
- Review environment and installation needs prior to the development of the System Installation Specification
- Document environmental states
|
|
Installation Planning (On-site)
|
- Plan and confirm schedule and resources with customer
- Plan and confirm delivery and installation dates
- Create installation related documentation
|
|
System Installation Specification
|
- Plan and confirm system setup requirements with customer
(up to 18 domains for E25K & up to 9 domains for E20K configured at time of system installation)
- System Controller configuration
- Domain Solaris installation & configuration
- Define patch baseline (default: current EIS-DVD contents)
- Confirm customer acceptance criteria (verification testing)
- Configuration of external storage (apart from boot disks) is not included
|
|
Statement of Installation
|
- Verify completion of pre-installation tasks
- Verify supported configuration
|
|
Installation and Customization of Sun Hardware and Software
|
- Review packing list to ensure all items are present
- Install all internal and external components
- Have power & grounding connected according to Best Practices or defined standards
- Label cables according to EIS or customer standards
- Power up system
- Configure pre-installed System Controllers and update patches from EIS-DVD as appropriate
- Test hardware components
- Update internal/boot disk firmware as appropriate
- Install and configure Solaris on each domain
- Configure as NIS, DNS client as appropriate
- Patch according to EIS-DVD baseline
- Configure NTP client
- Mirror boot disk as appropriate
|
|
Installation Verification
|
- Run explorer data collector and examine on-site with analysis tools from EIS-DVD
- Run all required tests according to previously defined acceptance criteria
- Post installation review and customer acceptance
|
|
System Turnover
|
- Installation review and customer sign off
- Provide system reference documentation detailing the installation
|